Skip to content

Marco Island, FL · Pool deck pavers

Pool decks for Marco Island waterfront homes

Cool enough for bare feet, tough enough for salt spray and built to stay level beside the canal. That’s the pool deck we design for island homes.

Typical range
$12–$25 / sq ft
Typical timeline
5–10 days
Service area
Marco Island, Isles of Capri & Goodland

Marco Island, FL · Collier County

On Marco Island, the pool deck often runs right up to the seawall, with the canal or the bay just a few steps away. That view is the reason people live here, and it also puts the deck in a tough spot: salt spray, intense reflected sun, sandy fill underneath and water on the other side of the wall. RL Installers is a family-owned paver contractor with 25+ years in the trade. We build and rebuild pool decks that stay comfortable, level and good-looking in that environment.

Many island homes already have a pool, so much of our work here is replacing worn concrete decks or resetting pavers that have shifted. When a project calls for a new pool, our sister company RL Poolscapes designs and builds it, and both companies share the Naples Design Center at 2464 Davis Blvd. You can compare materials and coping in person, and we’ll coordinate with your association so approvals are in hand before work begins. Our crew speaks English and Spanish.

  • Light, cool-to-touch materials for barefoot comfort in full sun
  • Sealing and material choices that stand up to salt spray
  • Careful base work and settlement checks on seawall-side decks
  • Association approvals and coordination with RL Poolscapes

Local guide

What to know in Marco Island

01

Pool decks beside the seawall

On canal lots, the strip of deck closest to the seawall is where problems show first. If fill behind the wall slowly washes out through a crack or a failing joint, the pavers above it start to dip, and no amount of re-leveling will hold until the cause is fixed. Before we rebuild or reset a deck near the water, we look for signs of that kind of loss and tell you plainly what we see.

If the wall itself needs attention, that’s a job for a marine contractor or engineer, and it should come first. Once the wall is sound, we excavate the soft areas, rebuild the base with compacted aggregate in layers and set solid edge restraints so the deck can’t creep toward the water. We slope the surface away from the pool, and we keep pavers, sand and debris out of the canal while we work.

02

Cool underfoot, steady in salt air

Island sun reflects off the water, so a dark deck can get too hot to cross barefoot by early afternoon. Travertine and light-colored concrete or porcelain pavers stay noticeably cooler, and they don’t show salt residue as much as darker tones. We’ll bring samples so you can compare them in your own backyard light, which on a west-facing canal can look very different from a showroom.

Salt from the air and from saltwater pool systems is hard on unprotected surfaces, especially porous natural stone. A penetrating sealer helps keep salt and moisture from working into the material, and an occasional fresh-water rinse removes buildup before it becomes a stain. We’ll recommend a sealer suited to your material and exposure, and explain how to tell when it’s time to reseal, so the deck keeps its color and texture.

03

Associations, condos and new pools

Gated communities such as Hideaway Beach, along with most condo associations on the island, review exterior changes before work starts, and some limit when and how contractors can work on the property. We help you prepare the submittal with a site plan, material specs and samples, and the City of Marco Island may also require a permit for some pool deck work. We’ll confirm what applies and take care of permits where required.

For a brand-new pool or a full remodel, RL Poolscapes builds the pool and RL Installers lays the coping and deck, with both teams planning from the same Design Center in Naples. That keeps coping height, drains and slope in agreement, and you deal with one family of companies from design to final cleanup. If you’re a seasonal owner, we can coordinate access with your property manager and keep you updated while you’re away.

How we work

From first visit to final walkthrough

  1. 01

    Consultation & site evaluation

    We visit your property to understand your vision, evaluate site conditions, review drainage and access, and discuss design options that fit your goals and budget.

  2. 02

    Design & material selection

    We develop a clear proposal with layout concepts, material recommendations, paver patterns and a defined scope and timeline.

  3. 03

    Preparation & installation

    Professional excavation, base preparation and expert paver installation — with precise compaction, drainage and clean finishing details.

  4. 04

    Final walkthrough & quality check

    We review the finished project with you, confirm every detail meets our standards, answer your questions and make sure the result exceeds expectations.

Proudly serving

Across Marco Island

Based in Naples at 2464 Davis Blvd — our Design Center, shared with RL Poolscapes — we work throughout Collier County and nearby communities.

All service areas
  • Hideaway Beach
  • Old Marco
  • Estates area
  • Tigertail Beach area
  • Isles of Capri
  • Goodland
“RL Installers did an excellent job for the Vanderbilt Reserve HOA. They repaired and reset over half of the pavers on our pool deck, which were being affected by palm tree roots. They carefully removed the pavers, dug out all the roots, re-sanded and reset the pavers. The crew worked efficiently in extremely hot temperatures and were very polite and friendly. Rafael was easy to work with and provided the initial inspection and a very competitive proposal in a timely manner.”
The CrescentVanderbilt Reserve HOA · Naples, FL · Google

Free estimate

Plan your Marco Island pool deck

Call (239) 245-0588 for a free on-site estimate, or visit our Naples Design Center to see deck and coping materials in person.

  • Most estimates within 24–48 hours
  • Licensed & insured · FL License #LCC2021-1729
  • Family-owned · English & Spanish
Angi Super Service Award 2022Angi Super Service Award 2023Angi Super Service Award 2024
What’s your project?

Approximate size, materials you like, timeline… anything that helps us prepare your estimate.

FAQ

Marco Island: common questions

What’s the best pool deck material on Marco Island?

For most island homes, a light travertine or a light concrete or porcelain paver is the best balance of comfort, salt resistance and looks. Travertine feels coolest underfoot but needs sealing; porcelain resists stains with very little upkeep. We’ll help you choose based on sun exposure, pool type and budget.

The deck near my seawall keeps sinking. Can you fix it?

We can rebuild the base and reset the pavers, but first we need to know why it’s sinking. If fill is escaping through the seawall, the wall should be evaluated and repaired by a marine contractor before any deck work. Once that’s resolved, we rebuild the area so it stays level.

How much does a pool deck cost on Marco Island, and how long does it take?

Pool deck pavers typically run $12–$25 per square foot, depending on the material, removal of the old deck, coping and site access. Most installations take 5–10 days. We measure on site and give you a free, itemized estimate with a clear schedule.

Do you work on condo and association pool decks on the island?

Yes. We inspect the deck, provide a written proposal the board can review, and plan the work in sections or around pool hours to limit disruption for residents. We’ll also coordinate with the property manager on access, parking and staging.

Start your project

Ready to build something that lasts?

Schedule a free consultation. We’ll evaluate your site, review your goals and send you a clear, detailed proposal.